2025年11月
Manor — drone photos of the site · November 2025
In the November 2025 drone photos the first rows of villas along the access road stand finished: white walls, dark roofs, pools visible from above. Neighbouring rows were at the column-frame and foundation stage; the eastern part of the site (later the Luxe Zone) was open earthworks with the perimeter wall built.


